You are about to spend more on this fence than on most of the furniture you will ever own, and it will sit in front of your house for a long time. Start acting wood privacy fence installer like it. Ask better questions. Getting and comparing written estimates is the cheapest insurance this project will ever have, but only if the estimates answer the questions that actually matter, and only if you ask the same questions of every bidder, in the same words, every time. The questions below are organized the way a good estimator thinks: scope first, then materials, then the fine print, then timing, then the things that move the price.
Getting and Comparing Written Estimates: Ask in This Order
The order matters because each answer changes the next question. A contractor who cannot describe the scope clearly will not give you a useful answer about materials, and an owner who skips straight to the price has already lost the advantage of the document. Work through the list with all three bidders, take notes on their answers, and compare the notes rather than the personalities. The goal is not to catch anyone in a lie. It is to find out which contractor has actually thought through your project.
Questions About Scope
Is this number for the whole job or just the fence itself? The question sounds obvious, and it separates careful estimators from the rest. Some bids cover only the new fence, with demolition, disposal, and gate hardware waiting in the wings. Ask directly what the number includes, and write down the answer. A good answer lists the included items without hesitation and names the excluded ones in the same breath. A hesitant answer means the scope is loose, and a loose scope is where the final invoice grows.
What exactly does the per-foot price include? A per-linear-foot price can mean panels only, or it can mean posts, concrete, fasteners, and labor. The difference is the entire cost of the project hiding inside one phrase. Ask for the breakdown, and compare the per-foot numbers only after you have confirmed they cover the same work. A good estimator will tell you exactly what the unit covers and what sits outside it, and that clarity is what makes the comparison honest.
How many posts, and where do they go? Post spacing decides how the fence behaves in wind and frost, and it is one of the first things to get skimped when a bidder needs a lower number. Ask for the spacing in feet, count the corners and gate posts on the plan, and make sure the estimate shows them. A fence that looks identical from the street can be built on very different foundations. The good answer names a spacing, explains why it suits your soil and exposure, and shows the posts on a sketch rather than leaving them to the crew's judgment on site.
Questions About Materials
What grade of material, and what dimensions? "Cedar" is a family, not a specification. Ask for the grade, the board dimensions, and whether the material is treated. Ask the same about posts and rails. When every bidder names their material precisely, the estimates finally become comparable, and the low number either earns its place or explains itself. The answer you want is specific enough to write on the contract, because the contract is the only thing standing between you and a substitution later.
What finish or treatment, and who applies it? A stain schedule, a sealant, or a factory finish changes both the price and the maintenance calendar. Ask whether the finish is applied before installation, after, or not at all, and ask who is responsible for the first re-coat. In a region with hard winters, the finish is not cosmetic. It is the difference between boards that shed moisture and boards that drink it. A good answer includes the product name and the application method, not a vague promise to "protect" the wood.
What hardware, and what quality? Gate hinges, latches, and fasteners are small line items with big behavioral differences. Galvanized hardware shrugs off the weather that eats plain steel. Ask what grade of hardware is in the number, and ask whether the gate hardware is included or billed separately. A gate that sags because it hung on the wrong hinges is a gate you will fix twice. The answer you want names the hardware and the gate rating, because hardware is one of the few parts of a fence you cannot see once it is installed.
Questions About Exclusions and Allowances
What is not included in this number? Ask this question out loud, even when the estimate seems complete. Demolition, disposal, grading, and repairs to the neighbor's fence are the usual suspects, and the answer tells you what the final invoice will look like. The contractor who lists exclusions without being asked is showing you how they handle the truth. The one who has to be dragged to it is showing you how the project will go when something unexpected comes up.
Which line items are allowances, and how are they settled? An allowance is a placeholder that gets adjusted to actual cost, and it belongs on the page with its own line. Ask what the allowance covers, what happens if the choice runs over it, and who keeps the difference if it runs under. Allowances are honest when they are visible. They are a problem when they hide inside a round total. A good answer names the allowance, its amount, and the process for settling it, and none of that should require a second phone call to pry out.
What happens if the site conditions are worse than expected? On GTA soil this is not a hypothetical. Clay that shifts in freeze-thaw cycles, buried rocks, roots, and a grade change under the lawn all surface after the holes open. Ask how the crew handles a post hole that cannot be dug as planned, and ask for the policy in writing. The contractor who answers with a process, not a shrug, is the one who has done this before. The answer you want describes how the problem gets priced and communicated before any work continues.
Questions About Validity and Timing
How long does this price hold? Material and labor conditions move through the season, and a number quoted at the spring thaw is not guaranteed in August. Ask for the validity date in writing, and ask what happens if you need more time. A contractor who refuses to date their own price is asking you to accept a moving target. A good answer gives you a concrete window and tells you what to do when it expires, which is usually a quick call to refresh the number rather than a renegotiation from scratch.
When does the work start, and when does it finish? Ask for dates, not ranges, and ask what the crew does when rain eats a week. Fence crews in this region book around weather windows and the summer backlog, and a start date that exists only in conversation is a start date that does not exist. Put the dates on the estimate or the agreement before you book anything else around them. A good estimator will give you a start window, a realistic duration, and a straight answer about the weather risk instead of a guarantee they cannot keep.
What happens if the schedule slips past the season? A fence started too late in the fall can stall against the first freeze, with posts set in half-frozen ground. Ask how the contractor handles a project that runs into the cold months, and ask who carries the cost of a second mobilization if the work stops and restarts. These answers matter more in Ontario than they do in warmer markets, and they are worth having before you sign. The answer you want shows that the contractor has a plan for the freeze, not just a hope that it holds off.
Questions About What Changes the Price
What would add to this number? Ask this question of every bidder and compare the answers. A grade change, a rock shelf, a utility line in the run, a taller gate, or a neighbor who wants a different style all move the price. The contractor who can list the triggers is showing you how they think about scope. The one who says "it depends" without detail is showing you something else. A good answer names the specific conditions at your property that would change the number, which means they actually looked at your property.
What could bring it down? A shorter run, a plainer material, a standard gate instead of a custom one, or a finish you will apply yourself can all reduce the total. Ask what the bidder would change to lower the number, and weigh each suggestion honestly. Some reductions are smart scope decisions. Some are the first step toward a fence that does not do the job. The answer you want distinguishes between the two, and the contractor who can make that distinction is worth hearing out.
How do change orders work, and who approves them? The fence business runs on surprises, and the change order is where surprises get priced. Ask how an unexpected cost is communicated, who has to approve it, and whether work stops while you decide. The answer tells you how you will be treated on the one day of the project that actually matters. A good answer describes the communication path in plain terms and confirms that nothing proceeds without your sign-off, which is the standard you should expect from anyone.
The Follow-Up Questions That Separate Answers From Scripts
Ask one question twice, in different words, and compare the answers. An estimator who has done the job will answer "how do you handle frost heave on clay soil?" the same way twice. One who is reading from a sales script will drift. Ask about the local conditions you actually have, whether that is the ravine behind a Markham lot, the hydro corridor beside a Whitby property, or the shared line between two Vaughan backyards, and listen for specifics instead of reassurance. Specifics are cheap to give and hard to fake, which is exactly why they separate the two kinds of estimators.
Then verify the things that cannot be answered. Confirm the insurance and WSIB details with the insurer directly rather than accepting a photocopy. Check the placement rules for your municipality before you commit to a height, and confirm the utility locates are ordered before any digging. Ask the bylaw office and the utility locator service their own questions. None of this is distrust. It is the same due diligence you would apply to any contract, and the contractors who are used to it will not blink. The ones who flinch at a verification request are telling you something, and it is worth hearing.
The Last Question
The last question is the one you ask yourself after the third estimate is on the table: which contractor would you trust to explain a problem to your face? Getting and comparing written estimates will not tell you everything about a crew, but it will tell you how they think, how they write, and how they answer hard questions. Those three things predict more about the project than any price. Ask the questions, compare the answers, and pool enclosure contractor hire the person who earns the job on paper, because the paper is where the fence is really built.